This video details the installation of a Geissele MK8 Super Modular Rail on an AR-15. Key steps include using a Geissele Reaction Rod for upper receiver stability, proper torquing of the proprietary barrel nut, and secure installation of the gas block and tube. The rail is then slid on and secured with two cross-bolts using a T-handle hex wrench. Final steps involve muzzle device installation and a thorough inspection.
You've reached the end! 1 videos loaded.
Gun Laws by State
Read firearms regulations for all 50 states + D.C.
Find Gun Dealers
Search licensed FFL dealers near you.