Mud Test: Desert Tech 308 MDR

Published on September 23, 2019
Duration: 8:43

The Desert Tech MDR in .308 Winchester demonstrated admirable performance in a mud test, earning a B+/A- grade. Key findings indicate the rifle functions reliably when the dust cover is closed, effectively sealing out contaminants. However, leaving the dust cover open or aggressive mud application can lead to failures, particularly with the side-ejection mechanism and magazine release.

Quick Summary

The Desert Tech MDR in .308 Winchester received a B+/A- grade in a mud test. It performed reliably with the dust cover closed but failed when open due to mud ingress. Key issues included the magazine release and ejection port, with aggressive mud fouling the side-ejection mechanism.

Chapters

  1. 00:00Introduction & Initial Function Check
  2. 00:48Mud Test 1: Dust Cover Closed
  3. 01:56Mud Test 2: Dust Cover Open
  4. 04:41Ejection Port Failure & Analysis
  5. 07:03Final Assessment & Conclusion

Frequently Asked Questions

How did the Desert Tech MDR perform in a mud test?

The Desert Tech MDR in .308 Winchester performed admirably, earning a B+/A- grade. It functioned reliably with the dust cover closed but experienced failures when the cover was open due to mud ingress into the action and ejection port.

What are the key failure points of the Desert Tech MDR in muddy conditions?

The primary failure points identified were the right-side magazine release and the ejection port when left open. Aggressive mud application could also foul the side-ejection mechanism, preventing the bolt from returning to battery.

Is the Desert Tech MDR suitable for use in harsh environments?

The MDR can be suitable if operated with care. Keeping the dust cover closed is essential for sealing out contaminants. While it showed resilience, significant mud ingress can cause malfunctions that require manual clearing.

What ammunition and magazine were used in the Desert Tech MDR mud test?

The test utilized Aguila 150gr ammunition and a Magpul P-Mag. The rifle underwent an initial 5-round function check before the main mud testing procedures began.

Related News

All News →

More Reviews Videos You Might Like

More from InRangeTV

View all →